When you say you've seen a unit, I presume you mean the control panel.
This is the tip of the iceberg and when you add on all the extra pipework, wiring, condener/evaporator units etc, the total, excluding labour will be well into 4-figures.
It can be done if cost is no barrier, but it's not easy.
Cheers,
Mike