Today I completed refitting the headlining. Whole job taken about 8 weeks. Final tally:
2 bolts missing; 2 torx screws left over; 2 broken trim clips; 2 broken nails; 1 very bruise hand!
Eagle eyes will spot that the groove has been filled with piping. This was because the edges of the 2 materials could be seen in the groove. I think it looks quite a good idea though it would be nice if it didn't go up and down so much. The outer panel material had thicker foam that the original OEM and the re-furbishers folded it round the edges along the sides whereas the OEM didn't. So it was a bit of a pain getting it installed along with all my sound insulation.
View attachment 100635 View attachment 100636
Will this one last 18 years, not that I shall be around then to find out!