Vorsprung durch Technik
A2OC Donor
Maybe ...
Ok.
Maybe ...
JRV found a friend today
Cheers
Rob
I wonder how many times we'll ever see 2x Jaipurs together
I followed on a little while back, if that counts
Only if you were in your A2
Well Project JRV is currently at WOM being given a thorough going over mechanically by Marcus. One thing that we did discover is that the door check strap must have failed at some point in the cars' life as it has a torn top hinge on the driver's door. So, a bit of judicious aluminium welding will be required.
Once that's been sorted he's booked in for a thorough going over the paintwork which is okay from a distance, but distinctly showing it's mileage from close up - plenty of motorway rash on the Votex splitter at the front, plus the usual grazes around the corners.
Finally, having had a good chat with Tom about options last night unfortunately the idea about Double-Din and RNS-E had to be blown out as its not got Climate Control and means that a whole shebang of work would need to be done to get that up and running. But I'm thinking the BOSE might still be going in. I'll get the exterior up to scratch first, and the oily bits.
I fitted a double din dash to an A 2 with manual heater controls. I believe it to be the only one in existence
I have the photos if you d cid to go this route.
Yeah, Tom mentioned that. Am I right you created some extra cogs to work the blower controls... It's a consideration, but I'll see how the servicing goes first.
Still interested in the TT wheels Jeremy